4GWh!CORNEX won the bid for China Electrical Equipment Group's energy storage battery procurement project!
2024-08-27Page View:9546
On August 27th, CORNEX won the bid for China Electrical Equipment Group's 4GWh energy storage battery procurement project. The total scale of the centralized procurement project for energy storage batteries by CEE is 14.54GWh, including 314Ah, 280Ah, 100Ah, 50Ah and other specifications of battery cells, divided into 4 sections and 11 packages. CORNEX (4.01GWh), CATL (2.12GWh), Lishen (2.12GWh), Great Power (1.87GWh), Narada Power Sources (0.99GWh), and HiTHIUM Energy Storage (3.43GWh) have each won bids for eight separate contract packages in the centralized procurement of energy storage batteries.
CORNEX won the bid for this project with its great technical strength, rich project experience, and excellent product performance, which not only reflects its leading position in the field of energy storage batteries, but also demonstrates its strong ability to mass produce high-quality energy storage products. In the future, CORNEX will actively promote global energy transformation and sustainable development.